Cisco TelePresence System TX9000 Assembly, Use & Care, And Field-Replaceable Unit Manual page 73

Table of Contents

Advertisement

Chapter 4
Installing And Performing Initial Leveling of the Main Display Structure
Attach the lower tie bar assemblies to the center structure by completing the following steps:
Step 4
a.
b.
c.
Note the dowel pins on the front of the tie bars that are shown in
Note
dowel pins to align the tie bars to the structure.
Do not fully tighten the screws until you perform final leveling of the entire display structure.
Note
Key Part Description
1
M8 x 16mm pan head screws
Figure 4-7
Attaching the Bottom Tie-Bars to the Center Assembly Structure
OL-27038-01
Position the bottom tie-bar assembly behind the lowest horizontal cross-piece of the center display
structure.
Place the connector plates over the bottom beam of the display structure.
Attach the plates to the bottom beam with M8 x 16mm pan head screws.
Part/Kit Number
48-3012-01
Kit #69-2365-xx
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
Qty
Ctn
4
6
Installing and Leveling the Display Structure
Figure 4-6
and
Figure
4-7; use these
Notes
4-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cts-tx9000Telepresence system tx9200Cts-tx9200

Table of Contents