Initial Switch Administration: G3I/G3S/G3Vs/R5Vs/R5Si/Prologix; Worksheets Needed - Lucent Technologies DEFINITY AUDIX Installation And Administration Manual

For g3i/g3s/g3vs/r5vs/r5si/prologix switches, tn2181 emulation, display set integration
Hide thumbs Also See for DEFINITY AUDIX:
Table of Contents

Advertisement

Installation and Switch Administration for G3i/G3s/G3vs/R5vs/R5si/ProLogix
Switches, TN2181 Emulation, Display Set Integration 585-300-122
4

Initial Switch Administration: G3i/G3s/G3vs/R5vs/R5si/ProLogix

Worksheets Needed

Initial Switch Administration:
G3i/G3s/G3vs/R5vs/R5si/ProLogix
This chapter describes the required switch administration for the DEFINITY
AUDIX system R4.0 on the following DEFINITY switches:
Release 5si and Release 5vs
G3i (V2 - V4)
G3s (V2 - V4)
G3vs (V2 - V4, R5 - R6)
G3si (V4, R5 or greater)
ProLogix (R6 or greater)
Worksheets Needed
Before beginning these tasks, make sure you have the completed the following
worksheets.
Worksheet A-2: Port Slot Assignments (For Carrier Rearrangement)
Worksheet B-1: Administer the Voice Ports as Stations (Digital Port
Emulation)
Worksheet B-2: Assign the Hunt Group (Digital Port Emulation)
Worksheet B-3: Assign the Call Coverage Path for Voice Ports (Digital Port
Emulation)
Worksheet B-4: Assign the Call Coverage Path for Subscribers (Digital
Port Emulation)
NOTE:
If you are changing the type of switch integration or the number of
voice ports on an existing system, skip this chapter and complete
the appropriate procedure in
Appendix
I.
Issue 1
May 1999
4-1
4

Advertisement

Table of Contents
loading

Table of Contents