Installation and Switch Administration for G3i/G3s/G3vs/R5vs/R5si/ProLogix
Switches, TN2181 Emulation, Display Set Integration 585-300-122
F
Migration Procedure
Remove the Existing DEFINITY AUDIX System
Figure F-9. Save Voice Screen
16. Press
The back-up begins and the cursor returns to the command line.
17. When the voice backup is complete (this can take a few minutes to several
hours depending on the amount of voice data), continue with
Task F-6: Remove the Existing
DEFINITY AUDIX System
1. Enter reset system shutdown to shut down the existing DEFINITY AUDIX
system.
2. Note which slots the DEFINITY AUDIX alarm board (third system slot) and
multi-function board (fourth system slot) occupy in the switch.
3. Verify that the DEFINITY AUDIX is shut down, then remove it from the
switch carrier.
4. Disconnect the short SCSI cable from the DEFINITY AUDIX MFB.
5. On the back of the switch, label each of the cables that connects to the
the alarm cable and the MFB cable on the DEFINITY AUDIX system.
(Enter) to run the voice back-up.
F3
NOTE:
Check the status periodically using the status tape command or the
display admin command.
Issue 1
May 1999
F-12
Task
F-6.