CITROËN ID 19 Repair Manual page 279

Table of Contents

Advertisement

ID 19
OPERATION
No.
ID 443-3
: Overhaulittg
a steering relay
Op.
ID 443-3
273
12
1
2
3
4
5
6
7
8
9
PARTICULAR
POINTS
On assembly, tighten
the
upper nut to 43
ft.lbs.
(6 mkg.)
at the same time turning
the lever to position
the balls. Slacken
the nut and then
retighten
to 14 to 22 ft.lbs. (2 to 3 m.kg.).
If
the work has been made necessary because of seizure of the relay, even at the limits of its movement, check the operation
of the ball
pin
of the other relay shaft and the pivot steer@
levers.
TOOLS
DISMANTLING
(see
Pl.
94).
Disengage
the rubber
bush
(49).
Force
the metal
locking
the lower
nut (50)
inwards
and remove
the
nut (spanner
1989-T,
see Pl.
96,
fig.
1) . . . . .
Disengage
the lower
lever
(42)
and steering
rod
(43) assembly
and the lower
bearing
race
(51).
Do not scatter
the
balls.
Remove
the race
(51),
the lower
nut (50)
and the rubber
bush
(49)
from
the lever
(42).
Drive
the metal
locking
the upper
nut (52) inwards
and remove
the nut (spanner
1988-T,
see Pl.
96,
fig.
3) . . . . . .
Remove
the upper
bearing
race
(53).
Clean
the parts.
ASSEMBLY
(see
Pl.
94).
Fit
the upper
bearing
race
(53).
Put the upper
nut (52) in position
and screw
up until
the upper
face is about
1 mm.
from
the upper
face of the relay
housing.
Introduce
20 g. of grease
(Antar
Cardrex
E. P. or,
if unavailable,
Compound
grease),
into
the relay
housing.
Put
14 balls
into
position
and secure
with
grease
in the upper
ball
race
(53).
'
On the lower
lever
(42) fit the rubber
bush
(49),
the lower
nut (50) and the lower
bearing
race
(51).
. .
. .
Spanner
1989-T
Spanner
1988-T

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents