Note - For the initialization of the chassis of the master XSCF, perform that work at the end.
Execute the restoredefaults -c factory command to return to the factory defaults, including
the CPU Activation key information. Perform this work with a serial connection to the
master XSCF.
For XCP 2041 or later, execute the restoredefaults -c factory -r activation command.
The key must be reinstalled at initial setup of the XSCF after installation.
8.
Remove the power cords from the power supply units of the target SPARC
M10-4S.
9.
Remove the XSCF BB control cables from the target SPARC M10-4S.
10. Remove the crossbar cables from the target SPARC M10-4S.
11. If the removal changes the configuration to the 1BB configuration, remove the
XSCF DUAL control cable.
12. Remove the target SPARC M10-4S from the rack.
Remove the SPARC M10-4S from the rack by reversing the mounting procedure.
For the procedure for mounting in the rack, see
M10-4/SPARC M10-4S in a
9.3.2

Installing expansion rack 1

This section describes the procedure for connecting power cords to a power
distribution unit (PDU) of the expansion rack and then installing the rack.
1.
Confirm the delivered components of expansion rack 1.
For details, see
rack."
2.
Before installing the rack, connect the power cords to a power distribution
unit (PDU) of the rack.
For details, see
units of an expansion
3.
Install expansion rack 1.
For details, see
9.3.3
Installing the SPARC M10-4S in expansion rack 1
In the expansion rack 1 installed in 9.3.2, mount the SPARC M10-4S that was changed
to 1BB configurations in 9.3.1. Then, perform installation work.
1.
Mount the SPARC M10-4S in the rack.
For details, see
2.
Set the ID required for identifying each chassis (BB-ID).
For details, see
3.
Connect the crossbar cables and XSCF BB control cables to each chassis.
Crossbar cables (optical) and XSCF BB control cables are already laid in the
expansion rack. The work here is to connect the cables to each port of the
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
268
rack."
"3.2.5 Confirming the delivered components of an expansion
"3.3.1 Connecting the power cords to the power distribution
rack."
"3.3.2 Securing the
rack."
"3.4.2 Mounting the SPARC M10-4/SPARC M10-4S in a
"4.1 Setting the ID (BB-ID) Identifying a
"3.4.2 Mounting the SPARC
Chassis."
rack."

Advertisement

Table of Contents
loading

Table of Contents