Installing Expansion Rack 2 - Fujitsu M10 Installation Manual

Hide thumbs Also See for M10:
Table of Contents

Advertisement

mounted chassis. Connect the cables according to the instructions written on the
labels.
For a cable connection diagram and a cable list, see
8BB Configuration (Connections through Crossbar
4.
Connect serial cables, LAN cables, and power cords to crossbar boxes.
For details, see
5.
Connect the system management terminal to the crossbar box of the master
XSCF, and then perform an initial diagnosis of the system.
For details, see
6.
Initialize the system settings from the crossbar box of the master XSCF.
For details, see
7.
Reconfigure the logical domains.
Assign the resources of the installed SPARC M10-4S to an existing logical
domain or a newly configured logical domain. For details, see the Fujitsu
M10/SPARC M10 Systems Domain Configuration Guide.
9.4

Installing Expansion Rack 2

This section describes the procedure for installing expansion rack 2 for the 8BB
configuration (2BB to 8BB) using expansion rack 1 to expand to the 16BB configuration
(9BB to 16BB). This procedure corresponds to pattern D in
You need to stop the system during this work.
For details on the XSCF commands executed in each step, see the Fujitsu M10/SPARC
M10 Systems XSCF Reference Manual.
1.
Log in to the master XSCF.
2.
Execute the showsscp command from the master XSCF to check whether the
IP address of the SP to SP communication protocol (SSCP) is a default value
or a value set by a user.
XSCF>   showsscp
Note - For details on the default SCCP IP address, see "3.7.5 Understanding the IP addresses
that are set with SSCP" in the Fujitsu M10/SPARC M10 Systems System Operation and
Administration Guide.
If the IP address is a default value and the default value should also be used for
the IP address of the SPARC M10-4S to be installed, go to the next step.
To set a user value, use the setsscp command to set an IP address, use the
applynetwork command to apply the SSCP IP address of the target SPARC
M10-4S, and confirm that it was reflected. Then, execute the rebootxscf
command to complete settings, and go to the next step. For details on the
"5.4 Connecting Cables to a Crossbar
"Chapter 6 Performing an Initial System
"Chapter 7 Making the Initial System
Chapter 9 Installing a System with a Building Block Configuration
"B.4 2BB Configuration to
Boxes)."
Box."
Diagnosis."
Settings."
Figure
8-2.
269

Advertisement

Table of Contents
loading

Table of Contents