Fujitsu M10 Installation Manual page 158

Hide thumbs Also See for M10:
Table of Contents

Advertisement

a. Confirm that the set BB-ID for the SPARC M10-4S mounted at the very
b. Next, set 01 for the BB-ID of the SPARC M10-4S mounted second from the
c. Sequentially set BB-IDs for all the SPARC M10-4S units while checking their
Figure 4-1     BB-ID switch of the SPARC M10-4S
2.
Check the BB-ID settings of the crossbar boxes.
A BB-ID is set for a crossbar box when shipped from the factory. Here, check the
mounting locations of the crossbar boxes, and confirm that BB-IDs 80 to 83 are
set sequentially.
If a setting is different, change the setting by operating the BB-ID switch on the
operation panel on the front of the crossbar box.
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
144
bottom of the rack (BB#00) is 00.
  If it is not 00, set it to 00 with a thin, pointed instrument.
bottom of the rack (BB#01).
mounting locations in the rack.

Advertisement

Table of Contents
loading

Table of Contents