g. Connect LAN cables to the target SPARC M10-4S.
h. Connect the power cords of the target SPARC M10-4S to the input power
i. Enter [f] from the command execution screen of the master XSCF.
2) Please select[f:finish] : f
Waiting for BB#1 to enter install state.
[This operation may take up to 20 minute(s)]
(progress scale reported in seconds)
0..... 30.... done
Waiting for BB#1 to enter ready state.
[This operation may take up to 45 minute(s)]
(progress scale reported in seconds)
0..... 30..... 60... done
Do you want to start to diagnose BB#2?[s:start|c:cancel] :
j. Skip the diagnosis of the building block to be installed, and then end the
Do you want to start to diagnose BB#1?[s:start|c:cancel] : c
Diagnostic tests are about to be skipped.
Running diagnostic tests are strongly recommended before using
BB#1.
Are you sure you want to skip testing?[y:yes|n:no] : y
------------------------------------------------------------------------------
Maintenance/Addition Menu
Status of the added FRU.
FRU Status
------------------- --------------
/BB#1 Normal
------------------------------------------------------------------------------
[Warning:007]
Running diagnostic tests on BB#1 is strongly recommended
after addfru has completed.
The addition of BB#2 has completed.[f:finish] : f
------------------------------------------------------------------------------
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
244
Connect the XSCF DUAL cable from the BB#00 DUAL port to the BB#01
DUAL port.
For details, see
"5.2 Connecting Cables to the SPARC M10-4/SPARC
supply.
addfru command.
Enter [c] from the input screen of the addfru command of the master XSCF to
skip the diagnosis processing for the BB to be installed.
When "The addition of BB#1 has completed." is output, enter [f] and then [c]
at the end to end the addfru command.
M10-4S."