Fujitsu M10 Installation Manual page 21

Hide thumbs Also See for M10:
Table of Contents

Advertisement

The number shown after BB# is the ID (BB-ID) identifying a chassis. The BB-IDs of
the SPARC M10-4S are set, starting at 00.
By clicking a reference in " " to display a section, you can see the details of the
respective step.
Table 1-4     Workflow for the SPARC M10-4S
Step (work time (*1))
Work description
Installation work (approx. 160 minutes (*2))
1
Check the latest information available
in the Fujitsu M10/SPARC M10 Systems
Product Notes.
2
Before installing the system, check the
safety precautions, system specifications,
and necessary conditions for
installation.
3
Prepare the necessary tools/
information for installation.
4
Confirm the delivered components.
5
Install the rack.
6
Mount the chassis in the rack.
7
If there are optional components,
mount them on the chassis.
8
Set the ID required for identifying each
chassis.
9
Connect crossbar cables, XSCF BB
control cables, and the XSCF DUAL
control cable to the chassis.
10
Connect serial cables, LAN cables, and
power cords to the chassis.
11
Store the connected cables in the rack.
Initial diagnosis (approx. 100 minutes)
12
Connect the system management
terminal to the chassis.
13
Confirm that the chassis identification
IDs (BB-IDs) are set.
14
Turn on the input power.
Reference
Fujitsu M10/SPARC M10 Systems
Product Notes
"Chapter 2 Planning and Preparing
for System
Installation"
"3.1 Preparing the Necessary
Tools/Information for
Installation"
"3.2.3 Confirming the delivered
components of the SPARC
See the manual for each rack.
"3.3.2 Securing the
rack"
"3.4.2 Mounting the SPARC
M10-4/SPARC M10-4S in a
"3.5.2 Mounting optional
components in the SPARC
M10-4/SPARC
M10-4S"
"4.1 Setting the ID (BB-ID)
Identifying a
Chassis"
"4.2 Connecting Cables (for Direct
Connections between
Chassis)"
"5.2 Connecting Cables to the
SPARC M10-4/SPARC
M10-4S"
"5.5 Storing
Cables"
"6.1 Connecting the System
Management Terminal to the
"6.2.1 Checking the BB-ID settings
(for the SPARC
M10-4S)"
"6.2.2 Turning on the input power
and starting the
XSCF"
Chapter 1 Understanding the Installation Flow
Required
Required
Required
Required
M10-4S"
Required
Required
rack"
Optional (*3)
Required
Required
Required
Required
Required
Chassis"
Required
Required
7

Advertisement

Table of Contents
loading

Table of Contents