Fujitsu M10 Installation Manual page 40

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Table 2-3     Third-party rack checklist (continue d)
Description
Size of chassis attachment
holes (common to front and
rear columns)
Vertical pitch of chassis
attachment holes
(common to front and rear
columns)
Door opening angle
Strength
Grounding
Toppling prevention measures
Earthquake resistance measures Earthquake resistance measures can be
*1 If the SPARC M10-4, M10-4S, or PCI expansion unit has square holes with sides of 9.0 mm (0.35 in.) to 9.2 mm
(0.36 in.), a separate rack mount kit must be ordered.
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
26
Condition
SPARC M10-1:
Square hole with sides longer than 9 mm (0.35 in.)
and not longer than 9.8 mm (0.38 in.) or M6 screw
hole
SPARC M10-4/SPARC M10-4S/PCI-BOX:
Square hole with sides longer than 9.2 mm (0.36
in.) and not longer than 9.8 mm (0.38 in.) (*1) or
M6 screw hole
EIA standards, universal pitch
Door opens to 130°
Rack has necessary strength/load capacity for
mounting chassis
Rack and units can be grounded
Rack can be prevented from toppling over
implemented for rack
Letter in
figure
L
M
--
--
--
--
--

Advertisement

Table of Contents
loading

Table of Contents