Preparing The Necessary Tools And Delivered Components For Installation - Fujitsu M10 Installation Manual

Hide thumbs Also See for M10:
Table of Contents

Advertisement

Chapter 9
Installing a System with a Building
Block Configuration
This chapter describes the procedure for installing the SPARC M10-4S in a building
block (BB) configuration.
For the installation procedure, see the relevant section corresponding to an
installation pattern shown in
Block

Preparing the Necessary Tools and Delivered Components for Installation

Installing the SPARC M10-4S
Adding Expansion Rack 1 (Installation for Expansion to Up to the 8BB
Configuration)
Installing Expansion Rack 2
Adding Expansion Racks 1 and 2
9.1
Preparing the Necessary Tools and
Delivered Components for Installation
This section describes the preparation for installing the SPARC M10-4S.
9.1.1
Preparing the necessary tools
The tools used to install the SPARC M10-4S are the same as those for initial
installation. See
Before starting installation work, be sure to see
installation."
Configuration."
"3.1 Preparing the Necessary Tools/Information for
"8.2 Confirming the Installation Pattern of a Building
"8.2.2 Points of concern during
Installation."