XSCF> showboards -p 0
PSB PPAR-ID(LSB) Assignment Pwr Conn Conf Test Fault
---- ------------ ----------- ---- ---- ---- ------- --------
00-0 00(00) Assigned y y y Passed Normal
01-0 00(01) Assigned y y y Passed Normal
11. Check the operation status of logical domains.
a. Execute the console command to connect to the console of the control
XSCF> console -p 0
b. Execute the ldm list-domain command, and confirm that the operation
# ldm list-domain
NAME STATE FLAGS CONS VCPU MEMORY UTIL UPTIME
primary active -n-cv- UART 32 28G 0.0% 2h 3m
guest0 active -n---- 5100 64 64G 3.1% 33m
root-dom0 active -n--v- 5000 32 32G 3.1% 47m
12. Reconfigure the logical domains.
Assign the resources of the installed SPARC M10-4S to an existing logical
domain or a newly configured logical domain. For details, see the Fujitsu
M10/SPARC M10 Systems Domain Configuration Guide.
After the reconfiguration, execute the ldm add-spconfig command to save the
logical domain configuration in the XSCF.
9.2.2
Installing the server after stopping the target
physical partition (PPAR)
This section describes the SPARC M10-4S installation procedure for expanding a 2BB
configuration to a 3BB configuration after stopping the target physical partition
(PPAR).
Stop applications in guest domains as required.
For details on the XSCF commands executed in each step, see the Fujitsu M10/SPARC
M10 Systems XSCF Reference Manual.
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
250
domain, and then log in.
status of the logical domains has not changed after the system board
(PSB) addition.
Check the operation status of the logical domains through the combination of
[STATE] and [FLAGS]. When [STATE] is "active," the second character from
the left of the string in [FLAGS] has one of the following meanings:
"n": Oracle Solaris operating
"t": OpenBoot PROM state
"-": Another state (including cases in which STATE is not active)