Fujitsu M10 Installation Manual page 106

Hide thumbs Also See for M10:
Table of Contents

Advertisement

6.
Affix connecting packings.
a. Affix vertical connecting packings 1 and 2 to the front and rear vertical
b. Affix the horizontal connecting packings to the horizontal column on the
Figure 3-21     Affixing connecting packings
FRONT
Number in
figure
1
2
3
4
7.
Remove the screws securing the top cover of expansion rack 2, and attach M6
core spring nuts to the front and rear of the rack.
a. Use an Allen wrench to remove the two M12 screws securing the top cover, at
Note - Be careful because work on the top cover section is done high off the ground. Never
do anything dangerous such as putting your foot on the rack, which would be very dangerous.
b. Attach two M6 core spring nuts in the lower part of the vertical column (left
c. Attach two M6 core spring nuts in the lower part of the vertical column (right
Fujitsu M10/SPARC M10 Systems Installation Guide ・ July 2015
92
columns on the right side of expansion rack 1. You can affix either of them at
the top.
For the locations for affixing the connecting packings, see (4) in
upper right side of expansion rack 1.
For the locations for affixing the connecting packings, see (3) in
Description
Horizontal column
Vertical column
Horizontal connecting packing
Vertical connecting packing
the front and rear on the left side, which is the connecting side.
side as viewed from the front) on the connecting side at the front of the rack.
side as viewed from the rear) on the connecting side at the rear of the rack.
Figure
3-21.
Figure
3-21.

Advertisement

Table of Contents
loading

Table of Contents