1.3 Key Points for Preparing an Installation Server

Preparation for installation
Item
Confirming environmental conditions
Preparing power source equipment
Confirming the installation location
Preparing to install the main unit
Confirming components
Mounting on a 19-inch rack
Connecting the power cable
For details, refer to "Hardware Installation Manual" and "Chapter 2 Preparing for Main Unit Installation" in
"Installation Manual".
PRIMEQUEST 2000 Series Linux Installation Guide
Follow the installation specifications.
Consider the following points when ensuring redundancy for the power supply.
Prepare two independent power sources for the power source equipment.
Do not connect both power cables to the same power source equipment.
Consider the size of each peripheral and the necessary service area (maintenance area).
Check the MMB configuration information (IP address, subnet mask, default gateway, etc.) before
installation.
Refer to the List of Attachment and confirm the delivered products.
Mount on a Fujitsu 19-inch rack.
Make sure to connect the power cable to a grounded outlet.
9
Key points
Copyright 2016 FUJITSU LIMITED