Chapter 3 Installing The System; Preparing The Necessary Tools/Information For Installation - Fujitsu SPARC M12-1 Installation Manual

Hide thumbs Also See for SPARC M12-1:
Table of Contents

Advertisement

Chapter 3
Installing the System
This chapter describes the work of preparing for installation, mounting a chassis in a
rack, and mounting optional components.

Preparing the Necessary Tools/Information for Installation

Confirming Delivered Components
Confirming the Rack
Mounting the Chassis in a Rack
Mounting Optional Components
3.1
Preparing the Necessary Tools/
Information for Installation
This section describes the tools and information that are required in installation.
Have these prepared before starting installation work.
Table 3-1     List of Necessary Tools
Name
Phillips screwdriver (#2)
Stepladder
ESD mat and antistatic wrist strap
Lifter
(hydraulic or mechanical jack)
System management terminal
(ASCII terminal, workstation, terminal server, patch
panel connected to terminal server, etc.)
Use
Used to attach cable support brackets and mount
optional components
Used for mounting at high locations in racks
Used in the work of mounting optional components
Used in the work of mounting chassis in racks
Used to connect to the XSCF and for the work of
checking and configuring the XSCF firmware
39

Advertisement

Table of Contents
loading

Table of Contents