On-Vehicle Service; Accelerator Cable Adjustment; Idle Speed / Idle Air Control (Iac) Duty Inspection - Suzuki Jimny Service Manual

Jimny suzuki
Hide thumbs Also See for Jimny:
Table of Contents

Advertisement

On-Vehicle Service

Accelerator cable adjustment

1) With throttle valve closed, check accelerator pedal play
which should be within following specification.
If measured value is out of specification, adjust it to specifi-
cation with cable adjusting nut (1).
Accelerator pedal play
"a" : 2 – 7 mm (0.08 – 0.27 in.)
2) With accelerator pedal depressed fully, check clearance
between throttle lever (2) and lever stopper (3) (throttle
body) which should be within following specification.
If measured value is out of specification, adjust it to specifi-
cation by changing height of pedal stopper bolt (1).
Accelerator cable adjustment clearance
(With pedal depressed fully)
"a" : 0.5 – 2.0 mm (0.02 – 0.07 in.)

Idle speed / idle air control (IAC) duty inspection

Before idle speed / IAC duty check, make sure of the following.
• Lead wires and hoses of Electronic Fuel Injection and engine
emission control systems are connected securely.
• Accelerator cable has some play, that is, it is not tight.
• Valve lash is checked and adjusted according to mainte-
nance schedule.
• Ignition timing is within specification.
• All accessories (wipers, heater, lights, A/C, etc.) are out of
service.
• Air cleaner has been properly installed and is in good condi-
tion.
• No abnormal air inhaling from air intake system.
After above items are all confirmed, check idle speed and IAC
duty as follows.
NOTE:
Before starting engine, place transmission gear shift
lever in "Neutral" (shift selector lever to "P" range for A/T
vehicle), and set parking brake and block drive wheels.
ENGINE AND EMISSION CONTROL SYSTEM 6E-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn413

Table of Contents