Pcv (Positive Crankcase Ventilation) Valve; Fuel Evaporative Emission Control System; Chassis And Body; Clutch - Suzuki Jimny Service Manual

Jimny suzuki
Hide thumbs Also See for Jimny:
Table of Contents

Advertisement

PCV (Positive Crankcase Ventilation) Valve

INSPECTION
Check crankcase ventilation hose and PCV hose for leaks, cracks
or clog, and PCV valve for stick or clog. Refer to "PCV System" of
Section 6E for PCV valve checking procedure.

Fuel Evaporative Emission Control System

INSPECTION
1) Visually inspect hoses for cracks, damage, or excessive
bends. Inspect all clamps for damage and proper position.
2) Check EVAP canister for operation and clog, referring to
"Evaporative Emission (EVAP) Control System" in Section
6E.
If a malfunction is found, repair or replace.

Chassis and Body

Clutch

INSPECTION
Check clutch pedal for height and free travel (1) referring to "Main-
tenance Service" in Section 7C. Adjust or correct if necessary.

Brake Discs and Pads

INSPECTION
1) Remove wheel and caliper but don't disconnect brake hose
from caliper.
2) Check front disc brake pads and discs for excessive wear,
damage and deflection. Replace parts as necessary. For
details, refer to "Brake Pad" and "Brake Disc" in Section 5.
Be sure to torque caliper pin bolts to specification.
MAINTENANCE AND LUBRICATION 0B-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn413

Table of Contents