6A1-20 ENGINE MECHANICAL (M13 ENGINE)
13) Remove intake manifold (1) with throttle body (2) and EGR
pipe (3) from cylinder head (4), and then its gasket.
INSTALLATION
Reverse removal procedure for installation noting the followings.
• Use new intake manifold gasket and EGR pipe gasket.
• Tighten long bolt (1), short bolt (3) and nuts (2) to specified
torque.
Tightening torque
Intake manifold bolts and nuts
(a) : 25 N·m (2.5 kg-m, 18.0 lb-ft)
• Check to ensure that all removed parts are back in place.
Reinstall any necessary parts which have not been rein-
stalled.
• Adjust accelerator cable play referring to "Accelerator Cable
Adjustment" in Section 6E.
• Refill cooling system referring to "Cooling System Flush and
Refill" in Section 6B.
• Upon completion of installation, turn ignition switch ON but
engine OFF and check for fuel leaks.
• Finally, start engine and check for engine coolant leaks.