Suzuki Jimny Service Manual page 88

Jimny suzuki
Hide thumbs Also See for Jimny:
Table of Contents

Advertisement

8) After the system has been charged with specified amount
(500 – 600 g) of refrigerant or when low pressure gauge (1)
and high pressure gauge (2) have indicated the following
specified amount, close low pressure side valve (3) on mani-
fold gauge set (4). At this time, look into the sight glass (5) of
receiver / dryer (6) and check that there are no bubbles (7) in
the sight glass, which means that the system is fully
charged.
Gauges should read as follows when ambient tempera-
ture is 30 °C (86 °F).
Pressure
on high pressure gauge
Pressure
on low pressure gauge
AIR CONDITIONING (OPTIONAL) 1B-27
1400 – 1750 kPa
14.0 – 17.5 kg/cm
199.1 – 248.9 psi
230 – 350 kPa
2.3 – 3.5 kg/cm
32.7 – 49.8 psi
2
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn413

Table of Contents