Isuzu 1999 RODEO Workshop Manual page 2099

Rodeo 1999
Hide thumbs Also See for 1999 RODEO:
Table of Contents

Advertisement

CLUTCH
7C–24
Installation
1. Clean and lubricate with grease.
2. Use the installer J–26516–A and driver handle
J–8092 to install the crankshaft bearing (7).
3. Install the fulcrum bridge (6) to the transmission case.
Tighten three fulcrum bridge bolts to the specified
torque.
Torque: 38 N·m (28 lb ft)
4. Apply molybdenum disulfide type grease to the pin
hole inner circumferences and thrust surfaces.
Attach the shift fork (5) to the fulcrum bridge (6) and
insert the pin from below of the fulcrum bridge. Install
the washer and snap pin.
015RS046
5. Apply molybdenum disulfide type grease to the areas
shown in the figure.
201RS026
201RS018
201RS015

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents