(5)
Adjustment of Turnover Route Switching Solenoid
Requirement
The gap between the E-ring of the plunger and the Switching Solenoid should be 3 ± 0.2
mm when the Switching Solenoid OFF.
Adjustment Procedure
3. Move the Switching Solenoid so that the gap between the E-ring of the plunger and the
Solenoid is 3 ± 0.2 mm when the Switching Solenoid OFF.
3 ± 0.2 mm
4. After adjustment is completed, tighten the two Switching Solenoid mounting screws.
1. Remove the Left Cover.
2. Loosen two screws by which the Switching Sole-
noid is mounted.
4002D214AC
D-83
4002D014AA