1.1.3
Loading the Starter
Di450 / Di550
14. Slide the Fusing Unit back into the copier and
tighten the screw.
While pressing down the Fusing Unit, slide it into
the copier.
15. Close the Left Upper Door.
1. Pull the Transport Unit Release Lever down.
2. Loosen two screws and slide out the
Developing Unit.
3. Remove three screws and unplug connector.
Take the Sub Hopper off of the Developing
Unit.
4. Pour one packet of Starter evenly into the
Bucket Roller side of the Developer
Chamber.
Shake the Starter well before pouring.
I-4
NOTE
NOTE
Rev. 1.1/10.00