The Probe Control Dialog Box's Control Tab - Waters Autospec Premier Operator's Manual

Table of Contents

Advertisement

3.
In the Rate text box specify the required value and then press Enter key.
4.
Repeat
pressed for the Hold text box, a new row (Ramp 2) is created.
5.
Repeat
To edit probe ramping data
1.
Double-click the text box to be edited.
2.
Specify the new value in the box and then press Enter.
3.
Repeat

The Probe Control dialog box's Control tab

Use this tab to manually run probe ramp methods and to view the ramping
method as it runs.
Probe Control dialog box's Control tab
6-18
Inlets and probes
step 3
for the Value and Hold text boxes. When the Enter key is
steps 3 and 4
as required to create further probe ramps.
steps 1 to 2
as required.

Advertisement

Table of Contents
loading

Table of Contents