Waters Autospec Premier Operator's Manual page 235

Table of Contents

Advertisement

5.
On each contact rail assembly, adjust the adjusting nut so that the outer
source assembly length over the contact rail assemblies is the same as
over the metal rods, as measured in
6.
Use the locknut to lock the adjusting nut.
7.
Fully tighten the nuts and screws fitted in
To connect the internal connecting leads
1.
Connect the filament and repeller wire push-on connectors on the
right-hand side contact rail assembly.
Filament and repeller
connections
Ion chamber
step
3.
step
2.
Left-hand side
heater connection
lead
Source maintenance
7-77

Advertisement

Table of Contents
loading

Table of Contents