1
Installing the Detector
Installing the Detector
Preparations
Parts required
1 Install the LAN interface board in the detector (if required), see
2 Place the detector in the stack or on the bench in a horizontal position.
3 Ensure the line power switch at the front of the detector is OFF.
22
Locate bench space
Provide power connections
Unpack the detector
Detector
Power cord, for other cables see below and
ChemStation and/or Control Module G1323A/B
the Interface Board"
on page 179.
1100 Series DAD and MWD Reference Manual
"Cable Overview"
on page 210
"Replacing