Note
◆ The threaded connection is accessible from below.
– Unscrew exhaust temperature sender 1 -G235- -item 1- from
exhaust manifold.
Installing
⇒ I tem 21 on page
● Specified torque
Installation is carried out in the reverse order; note the follow-
ing:
Note
◆ Coat thread of exhaust gas temperature sender with high-
temperature paste; high-temperature paste
Parts Catalogue.
◆ Fit cable tie in same place when installing.
Installation position of exhaust gas temperature sender -G235-.
● Angled shaft must have a distance -a- = 3 ... 5 mm to bolting
of turbocharger support.
– Electrical connections and routing ⇒ C urrent flow diagrams,
Electrical fault finding and Fitting locations.
2
Exhaust gas recirculation sys-
tem
WARNING
Adhere to the general safety regulations and the notes on
repair work on the engine!
Note
◆ The section below provides only general instructions, since
due to the various use cases of industrial engines it is not
possible to specify a common procedure.
◆ Renew self-locking nuts.
Assembly overview - exhaust gas recirculation cooler
⇒ P age
434.
Vacuum hose schematic diagram
Workshop Manual for Diesel Engine (2.0 l/36-75 kW_EA 189) 05.2015
325.
⇒ Electronic
⇒ P age 1
⇒ P age
334.
Industriemotoren - Industrial Engines 2009 ▶
2 Exhaust gas recirculation system
3
433