Separating New Conrods - Volkswagen CJDA Workshop Manual

Industrial engine
Table of Contents

Advertisement

Checking ring-to-groove clearance
Special tools and workshop equipment required
◆ Feeler gauges
Test procedure
– Clean ring groove before checking.
Piston ring
1st compression ring
2nd compression
ring
Oil scraper ring
Checking cylinder bores
Special tools and workshop equipment required
◆ Cylinder gauge 50...100 mm
Test procedure
– Take measurements at 3 positions in both transverse -A-
and longitudinal -B- directions, as illustrated.
Difference between actual and nominal diameter max. 0.10 mm.
Note
The cylinder bores must not be measured when the cylinder
block is mounted on a repair stand with engine and gearbox
support -VAS 6095-, as measurements may then be incorrect.
Piston installation position and allocation of piston to cyl-
inder
Arrow on piston crown -arrows- points in direction of cylinder 1.
4.2

Separating new conrods

On new conrods it is possible that the breaking point is not fully
separated. Proceed as follows, when the conrod bearing cap
cannot be removed by hand:
Workshop Manual for Diesel Engine (2.0 l/36-75 kW_EA 189) 05.2015
Clearance
New
m
0.06...0.09
m
m
0.05...0.08
m
m
0.03...0.06
m
Industriemotoren - Industrial Engines 2009 ▶
Wear limit
0.25
0.25
0.15
4 Dismantling and assembling pistons and conrods
3
185

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CjddCpyaCpybCpycCpydCpye

Table of Contents