Volkswagen CJDA Workshop Manual page 415

Industrial engine
Table of Contents

Advertisement

◆ Test box -V.A.G 1598/42- with adapter cable
-V.A.G 1598/39-1-
◆ Current flow diagram
Note
Instead of the vehicle diagnosis, testing and information system
other diagnosis systems, such as the DiagRA, may be used as
well.
Test prerequisites
● Fuses must be OK.
● The battery voltage must be at least 11.5 V.
● All electrical consumers must be switched off.
● Earth connections OK
Test procedure
– Switch off ignition.
Checking resistance
Pull connector -1...4- off injector to be tested.
– Connect multimeter to valve contacts 1 + 2 using test leads
from auxiliary measuring set -V.A.G 1594D- to measure re-
sistance. Specification: 50.0...700.0 kΩ
If the specification is not attained:
– Renew the defective injector.
– Then, read event memory of engine control unit, and clear
event memory if necessary
If specification is attained:
Checking for short-circuit to earth
– Using test leads from auxiliary measuring set -V.A.G 1594D-,
connect multimeter to relevant injector as follows:
◆ Injector contact 1 + engine earth
◆ Injector contact 2 + engine earth
Specification: ∞ Ω.
If the specification is not attained:
– Renew the defective injector.
Workshop Manual for Diesel Engine (2.0 l/36-75 kW_EA 189) 05.2015
⇒  P age
26, read event memory.
Industriemotoren - Industrial Engines 2009 ▶
2 Checking components and functions
3
399

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CjddCpyaCpybCpycCpydCpye

Table of Contents