Volkswagen CJDA Workshop Manual page 293

Industrial engine
Table of Contents

Advertisement

Note
◆ Hoses are secured with spring-type clips. In case of repair,
only use spring-type clips.
◆ Spring-type clip pliers -VAS 5024- are recommended for in-
stallation of spring-type clips.
◆ When the engine is warm, the cooling system is under pres-
sure. If necessary, release pressure before beginning repair
work.
◆ When installing coolant hoses, route stress-free so that they
do not come into contact with other components (observe
markings on coolant connection and hose).
◆ Perform leakage test of cooling system using cooling system
tester -V.A.G 1274- and adapters -V.A.G 1274/8- and
⇒  P age
-V.A.G 1274/9-
Parts of cooling system - engine side
Coolant hose schematic diagram
Draining and filling with coolant
Coolant in mixture ratios
ant.
Removing and installing coolant pump
Removing and installing 4/2-way valve with thermostat
⇒  P age
290.
Checking cooling system for leaks
Checking oil cooler for leaks
Workshop Manual for Diesel Engine (2.0 l/36-75 kW_EA 189) 05.2015
292.
⇒  P age
278.
⇒  P age 280
⇒  P age
284.
⇒  P age
284, Draining and filling cool-
⇒  P age
287.
⇒  P age
292.
⇒  P age 293
Industriemotoren - Industrial Engines 2009 ▶
1 Removing and installing parts of cooling system
3
277

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CjddCpyaCpybCpycCpydCpye

Table of Contents