Volkswagen CJDA Workshop Manual page 215

Industrial engine
Table of Contents

Advertisement

– With engine switched off, carefully pull return line connec-
tions off injectors. To do this, press both clips downwards
-arrow A- and simultaneously pull release pin upwards
-arrow B-.
Note
Adhere strictly to rules of cleanliness. No dirt must be allowed to
get into the disconnected fuel return lines or the open connec-
tions on the injectors.
– Remove entire fuel return line and set it down in front of in-
take manifold.
– Pull connector of position sender for charge pressure posi-
tioner -G581- -arrow- off turbocharger and guide wiring out
of retainers.
– Pull connector off fuel pressure regulating valve -N276-
-arrow-.
– Remove wiring harness from rail and lay to one side.
– Pull off vacuum line at the cylinder head cover. Remove the
other vacuum lines from the retainer on the cylinder head
cover.
– Remove upper toothed belt guard.
– Remove breather line between cylinder head cover and in-
take hose. Press quick-release fasteners to do this.
– Remove high-pressure line between high-pressure pump
and fuel rail.
– Remove high-pressure lines between fuel rail and injectors.
Workshop Manual for Diesel Engine (2.0 l/36-75 kW_EA 189) 05.2015
Industriemotoren - Industrial Engines 2009 ▶
3
1 Cylinder head
199

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CjddCpyaCpybCpycCpydCpye

Table of Contents