Volkswagen CJDA Workshop Manual page 307

Industrial engine
Table of Contents

Advertisement

– Pull coolant hoses off connections -A, B and D-.
– Pull coolant pipe out of connection -C-.
– Remove securing bolts -3- for 4/2-way valve -2-.
– Pull valve out of cylinder block and then to the left to subse-
quently separate connection -C- from coolant pipe.
Installing
Installation is carried out in the reverse order. When installing,
note the following:
Note
Clean sealing surfaces. Renew gaskets and seals.
– First seat 2-way valve with connection -C- on coolant pipe
then insert into cylinder block.
– Insert securing bolts -3-, and tighten them to 15 Nm.
– Connect coolant hoses as follows:
◆ -A-: Bypass line to cylinder head
◆ -B-: Expansion tank
◆ -D-: Radiator return line
⇒  P age
– Fill cooling system
– Install throttle valve module -J338-
⇒  P age
– Install alternator
Workshop Manual for Diesel Engine (2.0 l/36-75 kW_EA 189) 05.2015
284.
⇒  P age
355.
471.
1 Removing and installing parts of cooling system
Industriemotoren - Industrial Engines 2009 ▶
3
291

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CjddCpyaCpybCpycCpydCpye

Table of Contents