Volkswagen CJDA Workshop Manual page 209

Industrial engine
Table of Contents

Advertisement

– Disconnect connector for Hall sender -G40- -5-.
Continuation for all engine codes
– Detach plug from its retainer.
– Unscrew Hall sender -G40- -arrow-.
– Using a screwdriver, remove webs -arrows-, and remove re-
pair aperture cover -arrows-.
– Remove idler pulley -right side-.
– Remove repair aperture cover -arrows-.
– Remove Hall sender -G40- from cylinder head and guide its
plug through repair aperture in toothed belt guard.
Installing
Install in reverse order. Observe the following:
◆ Seal repair aperture in toothed belt guard using the respec-
tive rubber plug. ⇒  ETKA (Electronic Parts Catalogue).
◆ Idler pulley, renew bolt, specified torque: 50 Nm +
(90°) further
– Fit toothed belt, and adjust valve timing. Install toothed belt
⇒  P age
214.
Workshop Manual for Diesel Engine (2.0 l/36-75 kW_EA 189) 05.2015
1
/
Industriemotoren - Industrial Engines 2009 ▶
turn
4
3
1 Cylinder head
193

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CjddCpyaCpybCpycCpydCpye

Table of Contents