Before A Build - Stratasys F120 User Manual

Shared office 3d printer
Hide thumbs Also See for F120:
Table of Contents

Advertisement

Basic Job Build Tasks
6. Pull the head assembly out of its position within the gantry and remove it from the printer.
7. Insert a new head assembly into the vacant location within the printer.
8. Lock the head into place using the head release lever. Press the lever securely closed to
ensure that the head is properly seated.
9. Connect the material tube to the new head assembly.
10. Insert the head ribbon cable connector into the new head assembly ensuring it is fully
seated in the head and the connector retention latch engages.
11. Close the top cover.
12. An Automatic Tip Calibration will automatically be performed prior to the start of the next
build following a head replacement, see
Please note that the printer must be powered ON before calibration can occur.
Basic Job Build Tasks

Before a Build

To build a job, you must first download job files to the printer and then load individual job files to
the Job Queue using one of two methods:
Figure 17: Remove Head
If a head was replaced while the printer was powered OFF, an Automatic Tip
Calibration does not occur after closing the top cover, you must manually initiate
the calibration. See
"Automatic Tip Calibration" (page 130)
© Copyright 2020 Stratasys. All rights reserved.
"Automatic Tip Calibration" (page 130)
Before a Build
for details.
for instructions.
Page 110

Advertisement

Table of Contents
loading

Table of Contents