Powering Down The System; Basic Job Build Tasks; Before A Job Build - Stratasys Fortus 360mc User Manual

Hide thumbs Also See for Fortus 360mc:
Table of Contents

Advertisement

Powering Down the System

Warning: Due to the UPS, High voltage is present in the
system when the power cord is unplugged.
Caution: Do not turn the blowers off prior to the five minute
time-out or damage to the system may occur.
To power down the system, press the red button
• The oven lights go off.
• After a couple minutes, a series of shutdown messages flash on the screen.
• The screen will show:
• After a few minutes, the green light on the panel starts to flash.
Note: If you unplug the system, the head and oven blowers on
the system will continue to operate off the UPS for
approximately five minutes. The only way to turn the blowers
off is to turn the UPS off.
Note: Always wait a minimum of five minutes before
powering the system ON again.

Basic Job Build Tasks

Before a Job Build

To build a job, you must send the job file to the modeler from the Insight
application installed on your workstation. Jobs are sent in a CMB format and
placed in the job queue (stored on the system hard drive). The header of the CMB
file contains the processed job's basic information (material type, approximate
material amount required for build, tip size, etc.). This information is used to
verify job compatibility with the system setup.
For information about how to use Insight, see
For detail about how the system uses file information see
on page
1.
Prepare the system:
A.
B.
Warning: Wear proper safety equipment when handling items
inside the oven. Surfaces in the build chamber can be very hot.
It is now safe to turn off your system
3-18.
Power up the system.
Install a new build sheet.
(Figure
"Operating Insight" on page
4-4
4-1).
.
5-1.
"SmartSpool System"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortus 400mc

Table of Contents