Site Preparation Guide
F123 Series Shared Office
3D Printing System
Part No. 401692-0001_REV_H

Advertisement

Table of Contents
loading

Summary of Contents for Stratasys F123 Series

  • Page 1 Site Preparation Guide F123 Series Shared Office 3D Printing System Part No. 401692-0001_REV_H...
  • Page 2 This documentation contains proprietary information of Stratasys Ltd. This information is supplied solely to assist authorized users of this Stratasys 3D printing system. No part of this document may be used for other purposes, and it may not be disclosed to other parties. The specifications on which this document is based are subject to change without notice.
  • Page 3: Table Of Contents

    Safety......................iv Safe Environment........................ iv Introduction ....................1 How to Use This Guide......................1 About the F123 Series Printers ................... 1 System Components ......................2 Site Requirements ..................4 Physical Specifications and Space Requirements .............. 4 Environmental Requirements ....................7 AC Power Requirements.....................
  • Page 4: Revision Log

    The following basic safety tips are given to ensure safe installation, operation, and maintenance of Stratasys equipment and are not to be considered as comprehensive on matters of safety. Although the F123 Series printers are designed to be safe and reliable, access to areas of the printer are potentially dangerous.
  • Page 5: Introduction

    (FDM) technology provides prototype parts, including internal features, which can be used to field-test form, fit, and function. Direct Digital Manufacturing (DDM) allows for the creation of customized end-use parts straight from 3D CAD data. The F123 Series printers feature a servo/belt driven XY gantry with multiple modeling material capability.
  • Page 6: System Components

    Welcome Kit (containing documentation on how to download your user guide and common tools for maintaining the printer) • GrabCAD Print Software Package • A Computer Workstation (not sold by Stratasys) F170 Highlights • Maximum build area of 10 x 10 x 10 inch (254 x 254 x 254 mm) •...
  • Page 7 Site Preparation Guide Introduction F370/F370 CR Highlights • Maximum build area of 14 x 10 x 14 inch (356 x 254 x 356 mm) • Material Bays: 2 model, 2 support • Insight Software Package • Touchscreen Graphical User Interface •...
  • Page 8: Site Requirements

    3. Electrical Requirements 4. LAN Requirements The F123 Series printers are capable of generating vibrations depending mainly on part build geometry and material characteristics. This consideration will need to be taken into account if locating the printer near vibration sensitive equipment.
  • Page 9 Site Preparation Guide Site Requirements Figure 1: F123 Center of Mass All dimensions are in inches and are taken from the center of the front left leveling foot. Page 5...
  • Page 10 Site Preparation Guide Site Requirements Minimum Operational Clearances Sufficient rear and side clearances allow for proper air circulation, while sufficient front clearance allows enough room for the oven door and drawers to be opened. Side Clearance Minimum 4 inches (10.16 cm) on each side Rear Clearance Minimum 6 inches (15.24 cm) Front Clearance...
  • Page 11: Environmental Requirements

    Site Preparation Guide Site Requirements Environmental Requirements • The F123 Series printer is for indoor use only. • Air quality conditions with excessive solid particulates (conductive or non-conductive) may result in system damage. • Air quality conditions in which airborne oils are allowed to accumulate on or within the printer can damage the plastic components.
  • Page 12 Site Preparation Guide Site Requirements Power Consumption Power consumption is material dependent due to the various temperatures maintained in the build chamber. Power Consumption Power Consumption Power Consumption Material Type (while building) (while idle) (while sleeping) 650 W 510 W 10 W ABS ESD7 650 W...
  • Page 13: Ac Power Requirements

    A LAN connection is not required however, as the printer is also capable of file transfer via a Wi-Fi connection or a USB flash drive plugged into either of the printer’s USB ports. See the F123 Series User Guide for detailed information and instructions on transferring files to the printer.
  • Page 14: Preparing For Installation

    Preparing for Installation Inspect Crate for Damage Before opening the shipping crate, inspect the crate for signs of exterior damage. Report evidence of excessive damage to Stratasys and the shipping company. Required Tools and Equipment • Basic hand tools (powered screwdriver or drill with Phillips bit).
  • Page 15 Site Preparation Guide Preparing for Installation Remove Shipping Materials 1. Inspect the Tilt Indicators (2) and ShockWatch indicator affixed to the exterior of the cardboard box. If possible, take a picture of these indicators to share with your installation representative. If damage is detected upon installation, this photo will assist your installation representative in determining the cause of damage (Figure 2.
  • Page 16 Site Preparation Guide Preparing for Installation 6. Remove the foam restraining insert from the top of the printer (Figure Figure 5: Unpacking the Printer (cover removed) Cover Foam Insert Protective Cardboard Container Panels (x2) 7. Remove the printer from the shipping base, this can be done using a fork lift (see “Remove Printer from Shipping Base - Fork Lift Instructions”...
  • Page 17 Position the printer to allow at least three feet of clearance on all sides until the installation process is complete, see “Physical Specifications and Space . Refer to Chapter 2 of the F123 Series User Guide for final Requirements” (page 4) setup instructions.
  • Page 18 11. Open the chamber door and remove the orange tape securing the tip wipe assemblies to the purge chute. 12. Remove the protective film covering the Stratasys logo on the side panels. Remove Printer from Shipping Base - Ramp Instructions...
  • Page 19 Site Preparation Guide Preparing for Installation 2. Unlatch the link locks indicated in Figure 8 and remove the panels secured by these link locks. Figure 8: Remove Shipping Base Panels Unlatch this link lock and remove back panel by pulling it upward.
  • Page 20 Position the printer to allow at least three feet of clearance on all sides until the installation process is complete, see “Physical Specifications and Space Refer to Chapter 2 of the F123 Series User Guide for final Requirements” (page setup instructions.
  • Page 21: Site Preparation Checklist

    Site Preparation Guide Site Preparation Checklist Site Preparation Checklist Electrical Installation Requirements • A dedicated outlet of 100-132, 200-240 VAC~15-7A 50/60 Hz has been installed. • The grounded electrical outlet is within 2 meters (80 inches) of the printer. • The grounded electrical outlet is able to accept either a Euro or US power cord plug.