6.4.1 Verification activity - " SELF TEST "
•
Place the main power switch in position I (ON) ; anaesthesia
unit power on.
•
On the ventilator front panel, verify the electric power supply
led; green led on.
•
Keep STAND BY / ON-OFF Soft key pressed for a few
seconds to turn the ventilator module on.
The automatic " SELF TEST " phase begins.
Checking of Morpheus operation.
6-24
User's Manual, version DU3300105