Conclusions - Siare Morpheus E User Manual

Anaesthesia unit
Table of Contents

Advertisement

6.6

Conclusions

MORPHEUS
Before connecting a patient to the anaesthesia unit it is necessari to
perform and overcome all the preliminary tests.
If the preliminary tests phase is not overcome:
see cfr. 8 (Alarms) and cfr. 9 (Troubleshooting);
contact the nearest Siare Service Center or authorize by Siare.
WARNING! ! Risk of injuries for the patient
Before connecting a patient to the anaesthesia unit check the alarms
set vlaues (cfr. 8).
Modify the alarmi settings in function of clinical situation.
WARNING! ! Risk of injuries for the user / patient
The MORPHEUS anaesthesia unit must be inspected and
maintained once the 1000 hours operation are reached or, in case of
limited use, every 6 months at least.
All maintenance interventions and/or repairing require a perfect
knowledge of equipment, so they must be effected by highly
qualified, specifically trained personnel, formally authorized by
SIARE.
Inadequate interventions or not authorized modifications can
compromise safety and be dangerous for the patient.
6-51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Morpheus seriesMorpheus ltMorpheus m

Table of Contents