Concluding Steps - Fujitsu PRIMERGY TX2550 M4 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX2550 M4:
Table of Contents

Advertisement

Cabling

17.1.4 Concluding steps

Ê Install the fan bridge, see section
"Installing the system air duct" on page 68
Ê
"Reassembling" on page 68
Ê
"Connecting the power cord" on page 81
Ê
"Switching on the server" on page 82
Ê
17.2
Replacing the OOB cable
Field Replaceable Unit
(FRU)
Tools: tool-less
I
There are different OOB cables depending on the OOB configuration.
17.2.1 Preliminary steps
"Locating the defective server" on page 49
Ê
"Shutting down the server" on page 52
Ê
"Disconnecting the power cord" on page 53
Ê
"Getting access to the component" on page 54
Ê
"Removing the system air duct" on page 67
Ê
Ê Remove the fan bridge, see section
17.2.2 Replacing the OOB cable
I
Replacing the OOB cable is illustrated by the example with two
backplanes and extension box.
488
"Handling fan bridges" on page 90
"Handling fan bridges" on page
Upgrade and Maintenance Manual
Average task duration:
10 minutes
90.
TX2550 M4

Advertisement

Table of Contents
loading

Table of Contents