Concluding Steps - Fujitsu PRIMERGY TX2550 M4 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX2550 M4:
Table of Contents

Advertisement

Figure 222: Installing two Retimer controllers
Ê Install one Retimer controller in slot 8 (1).
Ê Install the other Retimer controller in slot 9 (2).
Ê Connect the VPP cable to the connector "VPP CPU2" on the system board
(see close-up 3).
Ê If applicable, connect an FBU to the expansion card, see section
a FBU" on page
9.5.1.4

Concluding steps

Ê If applicable,
"Installing the PCI air duct" on page 87
"Reassembling" on page 68
Ê
Ê Connect all external cables to the replaced expansion card.
"Connecting the power cord" on page 81
Ê
"Switching on the server" on page 82
Ê
"Updating expansion card firmware" on page 113
Ê
"Enabling Option ROM scan" on page 115
Ê
"Enabling SVOM boot watchdog functionality" on page 121
Ê
"Resuming BitLocker functionality" on page 127
Ê
Ê If applicable,
"After replacing/upgrading LAN controllers" on page 131
TX2550 M4
334.
Upgrade and Maintenance Manual
Expansion cards and backup units
"Installing
317

Advertisement

Table of Contents
loading

Table of Contents