Gambro Cobe Spectra Essentials Manual page 64

Table of Contents

Advertisement

Loading and Removing the Disposable Tubing Set and Other Common Operations
20
Place the RBC line in the RBC valve. Ensure the line is completely
inserted in the RBC detector.
Note: AutoPBSC procedures: The RBC reservoir rests
on the front panel below the RBC line valve and detector.
21
Place the return and inlet air chambers in the air detectors (see
Figure 4-8). Ensure the air chamber filters are located below the air
detector housings.
Figure 4-8: Placing return air chamber in air detector
4-8
22
Press the waste divert lines in the waste divert valve assembly. Push
the "Y" in first, then "floss" the tubing back into place (see Figure
4-9).
Figure 4-9: Pressing the waste divert lines in the valve assembly
23
Place the line in the centrifuge pressure sensor housing (see Figure
4-10).
Figure 4-10: Placing line in centrifuge pressure sensor housing
®
COBE
Spectra™ Apheresis System • Essentials Guide

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Gambro Cobe Spectra

Table of Contents