Suzuki XL7 2007 Service Manual page 1968

Jc636
Hide thumbs Also See for XL7 2007:
Table of Contents

Advertisement

7A-154 Heating, Ventilation and Air Conditioning:
Callout
Preliminary Procedure
1. Remove the thermal expansion valve. Refer to "Auxiliary Air Conditioning Evaporator Thermal Expansion Valve
Replacement".
2. Remove the auxiliary HVAC module. Refer to "Auxiliary HVAC Module Replacement"
3. Disconnect the electrical connectors.
HVAC Lower Case Screws (Qty: 6).
CAUTION
!
Refer to "Fastener Notice: ".
1
Tip:
• The HVAC lower and side cases must be separated for the evaporator core removal.
• Ensure the lower case gasket is in good condition upon installation.
Tightening torque
1.5 N⋅m (13 lb in)
HVAC Side Case Screws
2
Tightening torque
1.5 N⋅m (13 lb in)
Evaporator Assembly
Tip: Ensure the evaporator gasket is in good condition upon installation.
3
Tip: Ensure the temperature and mix doors are in the proper position upon assembly of the side
cases.
Component Name

Advertisement

Table of Contents
loading

Table of Contents