Suzuki XL7 2007 Service Manual page 1924

Jc636
Hide thumbs Also See for XL7 2007:
Table of Contents

Advertisement

7A-110 Heating, Ventilation and Air Conditioning:
8. Remove the screws retaining the two halves of the
blower case assembly.
9. Separate the two halves of the blower case
assembly.
10. Remove the evaporator core from the blower case
assembly.
Installation Procedure
1. Install the evaporator core to the blower case
assembly.
2. Assemble the two halves of the blower case
assembly.
CAUTION
!
Refer to "Fastener Notice: ".
3. Install the screws to retain the two halves of the
blower case assembly.
Tightening torque
Tighten the screws to 1.5 N⋅m (13 lb in).
4. Install the blower motor control module to the blower
case assembly.
5. Install the blower motor control module screws to the
blower case assembly.
Tightening torque
Tighten the screws to 1.5 N⋅m (13 lb in).
6. Install the blower motor to the blower case assembly.
7. Install the blower motor screws to the blower case
assembly.
Tightening torque
Tighten the screws to 1.5 N⋅m (13 lb in).
8. Install the air inlet assembly. Refer to "Air Inlet
Assembly Replacement".
9. Install the evaporator case assembly. Refer to "Air
Conditioning (A/C) Evaporator Case Assembly
Replacement".
10. Install the HVAC module. Refer to "HVAC Module
Assembly Replacement".

Advertisement

Table of Contents
loading

Table of Contents