Suzuki XL7 2007 Service Manual page 2090

Jc636
Hide thumbs Also See for XL7 2007:
Table of Contents

Advertisement

8B-78 Air Bag System:
57. Bend flat the twisted connection.
58. Secure and insulate the connection using electrical
tape.
59. Twist together, bend, and tape the remaining
connector wire lead to the remaining deployment
wire.
60. Connect the deployment harness to the roof rail
module yellow connector.
61. Route the deployment harness out of the passenger
side of the vehicle.
62. Completely cover the windshield and the front door
window openings with a drop cloth.
63. Stretch to the full length all of the deployment
harness wires on the right side of the vehicle.
64. Deploy each deployment loop one at a time.
65. Place a power source, 12 V minimum / 2 A minimum,
such as a vehicle battery, near the shorted end of the
harnesses.
66. Separate one set of wires and touch the wire ends to
the power source in order to deploy the selected
inflator module.
67. Disconnect the deployment harness from the power
source and twist the wire ends together.
68. Continue the same process with the remaining
deployment harnesses.

Advertisement

Table of Contents
loading

Table of Contents