Installing The Post-Column Cooler Insert - Thermo Scientific Dionex UltiMate 3000 Series Operating Instructions Manual

Column compartments
Hide thumbs Also See for Dionex UltiMate 3000 Series:
Table of Contents

Advertisement

UltiMate 3000 Series:
TCC-3000SD and TCC-3000RS Column Compartments

4.7 Installing the Post-Column Cooler Insert

Only TCC-3000RS
The post-column cooler insert is installed under the column chamber. A removable panel on
the front of the instrument provides easy access to the installation section.
1. Remove the panel.
2. Open the post-column cooler by pressing the clip down, and then push the insert, with
the label facing down, into the opening.
Clip
Fig. 23: Inserting the cooler insert (left: view from the top, right: bottom view)
3. Establish the capillaries connections to the post-column cooler insert (depending on
your application, from the outlet of the column or from the column switching valve)
and from the insert to the detector.
Two capillaries are connected to the post-column cooler. For a system stack as shown in
Fig. 8 (→ page 31), the long capillary should be guided to the detector because the length
of the capillary has been optimized for this connection.
For information about how to operate the TCC with post-column thermostatting, see page 74.
Page 52
Fig. 22: Removable panel for post-column cooler
Post-column cooler insert
Opening for post-column cooler insert
Removable panel
Operating Instructions
Clip

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tcc-3000sdTcc-3000rs

Table of Contents