Inspecting The Valve Drainage; Installing A Pre-Column Heater - Thermo Scientific Dionex UltiMate 3000 Series Operating Instructions Manual

Column compartments
Hide thumbs Also See for Dionex UltiMate 3000 Series:
Table of Contents

Advertisement

UltiMate 3000 Series:
TCC-3000SD and TCC-3000RS Column Compartments

4.4 Inspecting the Valve Drainage

The column switching valves are fitted with a drip tray for valve drainage. Liquid leaks
from the valves are discharged to waste, together with liquid leaks that might have
accumulated in the interior of the unit.
Fig. 16: Drip tray with drain tubing
connected to the left valve and to the right valve
Verify that the drain tubing is properly connected to the drain port. Liquid leaks are
discharged to waste through the drain system of the UltiMate 3000 system (→ page 56).

4.5 Installing a Pre-column Heater

Pre-column heaters can be installed at different positions in the column chamber. A
maximum of six pre-column heaters can be installed at the same time.
Fig. 17: Pre-column heater installed in the column chamber (example)
Install the pre-column heater as described in the installation instructions shipped with the
heater.
Operating Instructions
Page 49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tcc-3000sdTcc-3000rs

Table of Contents