Installation; Facility Requirements; Unpacking - Thermo Scientific Dionex UltiMate 3000 Series Operating Instructions Manual

Column compartments
Hide thumbs Also See for Dionex UltiMate 3000 Series:
Table of Contents

Advertisement

3 Installation

3.1 Facility Requirements

The installation site must meet the following requirements:
The main power switch and the main power receptacle are on the rear panel. Make sure
that
♦ Free and unrestricted access to the main power switch is ensured at all times.
♦ The power cord of the device can be easily reached and disconnected from the power
line at all times. Provide sufficient space behind the device to unplug the cable.
Make sure that the installation site meets the power and environmental specifications
listed in the Technical Information section (→ page 113).
Install the TCC in the laboratory on a stable surface that is free of vibrations.
Make sure that the surface is resistant to solvents.
The ambient temperature should be kept as constant as possible.
Avoid direct sunlight and high humidity.
Allow sufficient clearance behind and to the sides of the TCC for ventilation and do not
place any objects between the TCC and the module located below the TCC in the system
stack.

3.2 Unpacking

All electrical and mechanical components of the TCC are carefully tested before the
instrument is shipped from the factory. After unpacking, inspect the device for any signs of
mechanical damage that may have occurred during transit.
Tips: Immediately report any shipping damage to both, the incoming carrier and
Thermo Fisher Scientific. Shipping insurance will compensate for the damage
only if reported immediately.
Keep the original shipping container and packing material. They provide
excellent protection for the TCC in case of future transit. Shipping the TCC in
any other packaging automatically voids the product warranty.
1. Place the shipping container on the floor and remove the accessories kit and the power
cord. When unpacking a TCC-3000RS, also remove the box containing the pre-
column heater and post-column cooler
2. Grasp the TCC by the sides. Slowly and carefully, pull the instrument out of the
shipping container and place it on a stable surface.
Operating Instructions
TCC-3000SD and TCC-3000RS Column Compartments
UltiMate 3000 Series:
Page 29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tcc-3000sdTcc-3000rs

Table of Contents