Full Scheme Measurement - ABB REL650 series Technical Manual

Line distance protection
Hide thumbs Also See for REL650 series:
Table of Contents

Advertisement

1MRK 506 335-UUS A
6.1.6.2
Technical manual
I3P
PRECALCULATION
V3P
ANSI11000271 V2 EN
Figure 30:
ZQMPDIS logic diagram

Full scheme measurement

The execution of the different fault loops within the IED are of full scheme type, which
means that each fault loop for phase-to-ground faults and phase-to-phase faults for
forward and reverse faults are executed in parallel.
Figure
31
presents an outline of the different measuring loops for the five, impedance-
measuring zones.
I Comp
ZONE-1
V Pol
ZONE-2
ZONE-3
ZONE-4
ZONE-5
Section 6
Impedance protection
RELE
START
ASE
RELEASE
TRIP
LOGIC
LOGI
C
ANSI11000271-2-en.vsd
99

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents