General; Accelerator Cable Adjustment; A/T Throttle Cable Adjustment (4 A/T) - Suzuki 2000 Grand Vitara SQ625 Service Manual

Table of Contents

Advertisement

6E1-18 ENGINE AND EMISSION CONTROL SYSTEM (G16 / J20 ENGINES)
1. Accelerator cable
2. Adjusting nut
3. Lock nut
1. A / T throttle cable
2. Adjusting nut
3. Lock nut

GENERAL

When hoses are disconnected and system components are re-
moved for service, reinstall components properly, and route and
connect hoses correctly after service. Refer to Emission Control In-
formation Label or figure on previous page for proper routing of
hoses.

ACCELERATOR CABLE ADJUSTMENT

1) With throttle valve closed, check accelerator pedal play which
2) With accelerator pedal depressed fully, check clearance be-
1. Lever stopper
2. Throttle lever
3. Pedal stopper bolt

A/T THROTTLE CABLE ADJUSTMENT (4 A/T)

1) Make sure that accelerator cable is adjusted as specified.
2) Check clearance "c". If it is out of specification, adjust it by turn-
3) Tighten lock nut securely.
should be within following specification.
Pedal play "a": 2 – 7 mm (0.08 – 0.27 in.)
If measured value is out of specification, adjust it to specification
with cable adjusting nut.
tween throttle lever and lever stopper (throttle body) which
should be within following specification.
Clearance "b": 0.5 – 2.0 mm (0.02 – 0.07 in.)
(With pedal depressed fully)
If measured value is out of specification, adjust it to specification
by changing height of pedal stopper bolt.
ing cable adjusting nut.
Clearance "c": 0.8 – 1.5 mm (0.03 – 0.06 in.)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000 grand vitara sq4162000 grand vitara sq420

Table of Contents