Suzuki 2000 Grand Vitara SQ625 Service Manual page 527

Table of Contents

Advertisement

6B-22 ENGINE COOLING
INSTALLATION
For G16 engine
1) Install new pump gasket (2) to cylinder block.
2) Install water pump (1) to cylinder block.
Tightening Torque
Water pump bolt (G16 engine) (a): 12 N
3) After installing water pump, install rubber seal (1) between wa-
ter pump and oil pump.
4) Install belt tensioner, timing belt and timing belt outside cover
referring to "TIMING BELT AND BELT TENSIONER" in Section
6A1.
5) Install generator adjusting arm (1).
6) With engine oil applied to O-ring (2), install oil level gauge guide
(1).
7) Install crankshaft pulley, water pump pulley, pump drive belt,
cooling fan/clutch and fan shroud.
Tightening Torque
Cooling fan/clutch nuts (G16 engine):
.
11 N
m (1.1 kg-m, 8.0 lb-ft)
Crankshaft pulley No.2 bolts (G16 engine):
.
16 N
m (1.6 kg-m, 11.5 lb-ft)
8) Adjust cooling fan belt tension as previously outlined.
9) Connect negative cable (–) at battery.
10) Fill coolant.
11) After installation, check each part for leakage.
.
m (1.2 kg-m, 8.5 lb-ft)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000 grand vitara sq4162000 grand vitara sq420

Table of Contents