Suzuki 2000 Grand Vitara SQ625 Service Manual page 350

Table of Contents

Advertisement

6A2-26 ENGINE MECHANICAL (H25 ENGINE)
(a)
1. Oil pump chain guide
3) Assemble oil pump. After assembling oil pump check to be sure
INSTALLATION
1) Install oil pump to crankcase.
(d): Long size
2) Hand-tighten oil pump chain guide bolts.
1
3) To take up slack of oil pump chain, push center of oil pump chain
(e)
4) Install timing chain cover, oil pump strainer and oil pan.
that rotor turns smoothly by hand.
Tightening Torque
.
(a): 12.0 N
m (1.2 kg-m, 8.5 lb-ft)
Tightening Torque
.
(c), (d): 27.0 N
m (2.7 kg-m, 19.5 lb-ft)
guide with a force of 0.5 to 0.6 N (50 – 60 g, 0.11 – 0.13 lb) then
tighten oil pump chain guide bolts to specified torque.
Tightening Torque
.
(e): 11 N
m (1.1 kg-m, 7.5 lb-ft)
Refer to item "TIMING CHAIN COVER" in this section.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000 grand vitara sq4162000 grand vitara sq420

Table of Contents